MERA // MARKETPLACE EV INTELLIGENCESubscribe
Battery··1 min read

Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables

The Bihar Electricity Regulatory Commission (BERC) has proposed that wind and solar projects with battery energy storage systems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output to at least 105% o

#battery#india
For the original reporting, see Battery Feed.

Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables

The Bihar Electricity Regulatory Commission (BERC) has proposed that wind and solar projects with battery energy storage systems (BESS), with capacities above 10 MW and connected at 33 kV or higher, must be capable of increasing their output to at least 105% o

Full story

Read the original: Bihar Draft Grid Code Proposes Primary Frequency Response for Renewables

🚜
Sponsored · Eendhan Mobility
Diesel-to-electric retrofit for heavy equipment
Approved retrofit kits for excavators and commercial vehicles.
Learn more →

Mera Marketplace for EV businesses

Fleet leads, retrofit inquiries, battery sourcing and industry visibility — built for the companies moving India's EV economy.

Get these updates in your inbox

Funding rounds, tenders and fleet moves — twice a week. Free.

Free weekly briefing

Get India's EV funding, tender and fleet signals in 5 minutes

Join founders, fleet operators, battery companies and investors reading Mera EV Intelligence.

No spam. Unsubscribe anytime.